The Challenge

The City of Palm Coast, FL, had built a water treatment facility for the future. Unfortunately, faster-than-expected growth, not unusual in Florida, had outstripped the capabilities of the facility. Palm Coast approached 低质粗支亚麻纱 R/O Systems to retrofit its two existing trains from 2.0 MGD to 2.4 MGD each and add two more 2.4 MGD trains. Although the plant was well built originally and well maintained, 低质粗支亚麻纱 R/O needed to meet the City’s future needs while meeting its current needs throughout the plant retrofit.

The Solution

低质粗支亚麻纱 R/O Systems took the lead in assembling a team that incorporated contractors and subcontractors who had experience with the original plant design and construction. The City wanted people they could trust and, having dealt with similar situations on past projects, 低质粗支亚麻纱 knew that enlisting trusted past partners would not only make the City more comfortable but yield knowledge that would prove very valuable.

The Result

“The whole concept of design/build for these types of projects is still in an emerging phase but 低质粗支亚麻纱 leads the field in its knowledge and expertise.” said Brian Matthews of the City of Palm Coast. "'They assembled the right team. They utilized the knowledge and experience of those involved in the original plant and supplemented it with their own expertise. They understood the complex needs of the project and came up with innovative solutions that were transparent in terms of our ability to deliver to our customers, especially when you’re dealing with a project of this complexity.”

The 低质粗支亚麻纱 Team worked through a complicated scheduling and coordination of shutdowns throughout the retrofit to maintain capacity until the project’s completion. The close supervision and coordination of the efforts of all parties on the team is a 低质粗支亚麻纱 R/O trademark on these types of plant retrofits. In addition, 低质粗支亚麻纱 R/O was able to recommend a variety of enhancements and improvements to the plant’s treatment system such as redesigning the motor control system, and installing variable frequency drives that led to significant cost savings and greater system efficiency.

READ MORE TESTIMONIALS

 

老板:
City of Palm Coast, FL


Design Build Lead
低质粗支亚麻纱 R/O Systems, Inc


Engineer:
Phase 2 - Carollo 工程师


Application:
Potable drinking water


启动:
April 2004


Capacity:
6.4 MGD


数组:
18:9, 7-element vessels, 4 trains


膜:
Dow Filmtec NF90


Operating Data:
Feedwater TDS: 700 mg/l Permeate TDS: 60 mg/l R/O Feed Pressure: 100psi Recovery: 85%


System Features:

  • Eliminated permeate backpressure, installed interstage boost pumps and VFD’s for energy savings and improved control
  • Redesigned existing skids to improve operation and access for maintenance
  • Provided turn-key system from pre-treatment through degasification

FEATURED 美高梅官方网站app

Hilton Head, SC

Hilton Head, SC

The South Island Public Service District (SIPSD) in Hilton Head, SC, chose an innovative procurement process to carefully assemble a…

阅读更多
Mt. Pleasant, SC

Mt. Pleasant, SC

Mount Pleasant Waterworks in South Carolina, a private utility, was planning a plant expansion to better serve its customers when…

阅读更多
Lancaster, OH

Lancaster, OH

The City of Lancaster, Ohio realized it had to replace its aging ion exchange water treatment facility with a new…

阅读更多

RETROFIT 美高梅官方网站app

Palm Coast, FL

Palm Coast, FL

The City of Palm Coast, FL, had built a water treatment facility for the future. Unfortunately, faster-than-expected growth, not unusual…

阅读更多
Sarasota, FL

Sarasota, FL

The City of Sarasota, FL needed to retrofit its sole water plant from the existing hollow fiber membrane reverse osmosis…

阅读更多